

6,211.16 ft
RisingClear · 0 mph N
Good
Best window: 6:30 PM–7:30 PM
Level 4 hours ago · Weather 48 minutes ago · Los Alamos Airport
Abiquiu Lake is managed by U.S. Army Corps of Engineers — Albuquerque District. Lake Insights displays its latest available elevation from USACE SPA District. Published reference elevations are listed below.
8.84 feet below full pool
−8.84 ft vs full pool
Abiquiu Lake is currently 8.84 feet below full pool and has been rising over the past week. Recent conditions indicate improving reservoir levels, although the lake remains below its normal operating elevation.
Rio Arriba County, NM · U.S. Drought Monitor county statistics at the lake location (not a lake-specific designation)
Severe Drought
The largest share of Rio Arriba County, NM is in Severe Drought (D2), an official USDM drought category. These figures describe the surrounding county from the lake location, not the lake itself.
Severity
Weekly trend
Improving
Compared with last week
Official drought (D1–D4)
Yes
92.6% of the surrounding county is in official drought categories (D1–D4). Dominant category remains Severe Drought.
Typical county impacts (USDM guidance)
U.S. Drought Monitor · map date Oct 20, 2026. Updated weekly. Official drought means U.S. Drought Monitor categories D1–D4 (Moderate through Exceptional). Abnormally Dry (D0) is not counted as official drought. droughtmonitor.unl.eduView drought map for Rio Arriba County, NM
Managing authority
Waterbody / project type
Official purposes
General factors for reservoirs like this
These are common influences for this type of lake. They do not identify the cause of a specific current change unless an operator update confirms it.
Rainfall & inflows
Rain and upstream river inflows can raise reservoir levels, especially after storms.
Downstream releases
When an operator releases water through a dam, reservoir storage can fall and downstream flows can rise.
Published reference elevation. Not necessarily a fixed year-round target for every project.
Managing authority: U.S. Army Corps of Engineers — Albuquerque District
Observation source used by Lake Insights: USACE SPA District
Who manages the lake and who publishes the reading Lake Insights displays can differ. Lake Insights does not invent a source label from the managing authority alone.
Shared background — not lake-specific facts
Lake Insights aggregates water level information from authoritative public sources such as the U.S. Army Corps of Engineers, NOAA, TVA, Bureau of Reclamation, power utilities, and other official lake operators. We preserve historical observations, calculate trends, and present lake conditions in a consistent format. For USACE SPA District, we link to the official source whenever it is available. Lake Insights does not predict future lake levels unless an official forecast has been published by the managing authority.
Full pool
Datum
Current-level source
Project / NID identifier
Dam / watershed (NID inventory record)
Dated National Inventory of Dams fields from a confidently matched record — design values and inventory dates, not live gage readings and not a current inspection or safety determination. An older or missing inspection date does not mean the dam is currently unsafe.
Last inspection date: Apr 25, 2023
Emergency Action Plan: Yes
Inventory record values only. Dates shown are what NID published for this dam entry — not a Lake Insights inspection or an up-to-date safety rating.
National Inventory of Dams · matched record: Abiquiu Dam (NM00001) · last inspection date on record Apr 25, 2023
Flood-risk operations
Some projects store or release water under flood-risk rules when conditions require it.
Water supply
Some reservoirs support municipal, industrial, irrigation, or regional water-supply needs.
Hydropower
Hydropower projects may pass water through turbines when generating electricity.
Seasonal weather
Dry periods, heat, evaporation, and seasonal rainfall patterns can affect storage over weeks and months.